Discipline: DBFOM
Sector: Infrastructure (Motorways)
Client: Gdansk Transport Company S.A
(ultimate client: Ministry of Infrastructure)
Start: 2007
Duration: 32 years
Status: ongoing
Routine O&M activities:
Tolling:
The A1 Motorway in Poland extends from Gdansk in northern Poland to the Czech Republic border and is part of European Road E75 which provides access to Southern Europe. The A1 motorway will cross the A2 and A4 motorways in Poland. It is therefore part of Poland’s international route connection. Intertoll had a pivotal role in the successfully signing of the Concession Contract in 2004 and achieving financial close in 2005.
Project consists of 90 km of tolled A1 Motorway south between Gdansk and Nowe Marzy and includes 5 interchanges, 86 bridge structures, 6 service areas, 2 Operation and Maintenance Centres.
Intertoll Polska Sp. z o.o. (100% Intertoll Europe ZRt. affiliate) is in charge of the operation and maintenance of the motorway as well as the manual toll collection (a closed system, consists of 2 mainline toll plazas and 5 ramp toll plazas. Total number of toll lanes: 40 (16 entry and 24 exit lanes).
Other roles of Intertoll in this project:
Head Office:
BudaWest building
Rétköz útca 5.
H-1118 Budapest, Hungary
Barham Court
Teston
Maidstone
Kent, ME18 5BZ, United Kingdom
Phone - +44 1622 232742
Fax - +44 1622 812089
Pelplin Office
Ropuchy 7a
83-130 Pelplin, Poland
Phone: +48 58 530 66 99
Fax: +48 58 530 66 95
E-mail:
Levent Mahallesi Cömert
Sokak No: 1,
Yapi Kredi Plaza C Block
No: 40-41, Floor: 17
Levent, 34330 Beşiktaş, Istanbul, Turkey
Intertoll Infrastructure Developments BV,
President Kennedylaan 19,
Den Haag 2517 JK,
Netherlands